Although it has better lifting capacity, they have managed to reduce the weight of the basic machine by 17 tonnes, improving the crane’s transportability. Terex Cranes put the focus on all erections and transportation elements to provide the highest return on investment. Assist crane is also not required to erect the main boom. The Superlift 3800 can be delivered with an integrated wind kit in universal main boom system, meaning erecting 117 metres high wind turbines without using super lift boom configuration.
0 Comments
Leave a Reply. |